Home > BUSINESS > Performance optimization, technical reformation and equipment upgradeServices
Pakistan Nandipur 425/525 MW CCPP Condenser Chemical Cleaning Project
Time:2022-10-25 18:00:14  Views:

Pakistan Nandipur 425/525 MW CCPP Condenser Chemical Cleaning Project(圖1)


Pakistan Nandipur 425/525 MW CCPP situated at Nandipur near Gujranwala in the Punjab province of Pakistan. Due to the high calcium hardness and alkalinity of circulation cooling water (deep-well water), the condenser tubes` scaling problem had seriously affected its output and efficiency. The thickness of scale reached 0.4~1.0mm, meanwhile the terminal temperature difference of condenser was down to around 14℃ low. In order to break this limit, the condenser chemical cleaning work was implemented in September to October 2018. Sulfamic acid and proper inhibitor, with a Chinese patented cleaning method was adopted to this work. The scale analysis report indicates that the main component of scale is calcium and magnesium carbonate type. During the construction process, a large amount of black and oily components were found in the scale. It was considered that during the HFO operation period, a large amount of ash and other oily dirt were deposited as scale. Heavily scaling situation makes chemical cleaning work more challenging.


亚洲一区色77综合影院_8X国产精品视频_一本大道无码日韩精品影视__欧美熟妇另类久久久久久不卡
<thead id="xj7bx"></thead>

    <thead id="xj7bx"></thead>

            <big id="xj7bx"></big>

            <big id="xj7bx"></big>
            <dfn id="xj7bx"></dfn>