Reformation of 60MW steam turbine shaft sealing system at Wuhan Hanneng Electric Power Development Co.,Ltd. of China General Nuclear Power Group
Time:2022-10-25 18:03:43  Views:

Reformation of 60MW steam turbine shaft sealing system at Wuhan Hanneng Electric Power Development Co.,Ltd. of China General Nuclear Power Group(圖1)

Project profile :Due to the design defects of the steam turbine shaft sealing system in Wuhan Zhuankou Gas Turbine Power Plant, as the operation time gets longer, the defects become more and more serious, the system needs to be modified to eliminate the safety hazard. After the site survey and comprehensive evaluation and analysis of the operating system under different operating conditions, we adopted a targeted technical transformation plan, modified the shaft sealing system. Finally we solved the air and steam leakage problem of steam turbine shaft sealing system and lube oil emulsification problem.


亚洲一区色77综合影院_8X国产精品视频_一本大道无码日韩精品影视__欧美熟妇另类久久久久久不卡
<thead id="xj7bx"></thead>

    <thead id="xj7bx"></thead>

            <big id="xj7bx"></big>

            <big id="xj7bx"></big>
            <dfn id="xj7bx"></dfn>