Home > ProjectsProjects
Shenzhen Nantian Power Plant #8 Steam Turbine Operation Layer Noise Reduction Project
Time:2022-10-25 18:03:43  Views:

Shenzhen Nantian Power Plant #8 Steam Turbine Operation Layer Noise Reduction Project(圖1)


Project Profile:In order to improve the working environment and reduce the main control room noise, NTPS took over the #8 Steam Turbine Operation Layer Noise Reduction Project in Shenzhen Nantian Power Plant. NTPS fully considered the work condition and work requirement of steam turbine and generator, made targeted design and manufacture to meet noise reduction requirements.


亚洲一区色77综合影院_8X国产精品视频_一本大道无码日韩精品影视__欧美熟妇另类久久久久久不卡
<thead id="xj7bx"></thead>

    <thead id="xj7bx"></thead>

            <big id="xj7bx"></big>

            <big id="xj7bx"></big>
            <dfn id="xj7bx"></dfn>